SWCC CDL Training Range

Bid Date: 2PM on 04/03/2024

Project Location

Scheduled Start Date

5/3/2024

Scheduled Completion Date

10/18/2024

Site work and paving for a mixed-use development in Creston, Iowa. Completed plans call for site work for a bridge / tunnel; for paving for a road / highway; road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot. SWCC - CDL TRAINING RANGE - SITE IMPROVEMENTS - CRESTON, IA - 2024 - Excavation, Class 10 - 2580 CY; Subgrade Preparation (12" Thick) - 9,151 SY; Granular Subbase, Modified Subbase, 6" Thick - 8,954 SY, Compaction Testing - 1 LS; Trench Compaction Testing - 1 LS; Removal of Storm Sewer <= 24" - 35 LF; Pipe Culvert, Trenched, HDPE, 15" - 60 LF; Fire Hydrant Adjustment - 1 EA; Water Meter Relocation - 1 EA; Intake Adjustment, Major - 1 EA, Pavement, PCC, 6" Thick - 1,063 SY; Pavement, PCC, 7" Thick - 7,511 SY; PCC Pavement Samples and Testing - 1 LS; Pavement Removal - 696 SY; Granular Surfacing, Macadam Stone, 4" Thick - 169 SY; Granular Surfacing, Class 'A', 2" Thick - 169 SY; Granular Surfacing, Class 'A', 7" Thick - 333 SY; Removal of Shared Use Path - 79 SY; Shared Use Path, PCC, 5" Thick - 57 SY; PCC Sidewalk, 5" Thick - 22 SY; Painted Pavement Markings, Solvent/Waterborne - 8 STA; Painted Symbols and Legends - 3 EA; Temporary Traffic Control - 1 LS; Bollard - 10 EA; Conventional Seeding, Fertilizing and Mulching - 1 LS; SWPPP, Preparation - 1 LS; SWPPP, Management - 1 LS; Silt Fence - 640 LF; Mobilization - 1 LS