South Hamilton Jr/Sr High School Addition

Bid Date: 2PM on 03/12/2026

Project Location

Scheduled Start Date

5/11/2026

Scheduled Completion Date

7/31/2027

Site work, renovation and addition to an educational facility in Jewell, Iowa. Completed plans call for the addition of a educational facility; and educational facility. The project consists of an addition and related renovations to the Jr-Sr High School for South Hamilton CSD. The addition includes an entry area, gymnasium space, weight room, concessions, restrooms, and storage/mechanical spaces. The gymnasium shell is to be constructed of precast concrete wall panels, steel joists, and metal deck. The weight room, concessions, restrooms, and entry space shell is to be constructed of CMU cavity walls with brick veneer, metal joists, and metal deck. The work also includes curtain wall, storefront, and fiberglass sandwich panel systems. Civil scope includes replacement of sidewalks and curbs, new sidewalks, landscaping beds, and plantings. Utility relocations and new work are shown in the contract documents. Mechanical scope includes new rooftop mechanical equipment, controls systems, and associated distribution ductwork. Plumbing scope includes overhead and underfloor piping for various spaces, and a new main sprinkler line to service the addition from the sprinkler room within the existing building. Electrical work includes lighting, power, technology infrastructure, and access control. Electrical conduits and fiber cabling will be extended through the existing building to serve the addition. Renovation work includes areas shown on the drawings for routing of mechanical, plumbing, electrical, technology infrastructure, and other improvements or modifications where the existing building meets the addition construction.