De Soto Fire Station Project

Bid Date: 2PM on 10/16/2025

Project Location

Scheduled Start Date

11/17/2025

Scheduled Completion Date

10/31/2026


Site work, paving and new construction of a mixed-use development in De Soto, Iowa. Completed plans call for the construction of a fire / police facility; for site work for a fire / police facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; and water / sewer project. Construct a new fire station consisting of an insulated pre-engineered metal building with vertical metal siding and brick veneer on the east side, exterior sitework, and miscellaneous associated work, including cleanup. The west half of the building includes 4 apparatus bays with liner panels on the walls and ceiling. The east half of the building includes a training room, kitchen, 2 offices, 2 single user restrooms, storage, mechanical room, and a decontamination room with washer, dryer and shower with stud walls with gyp board finish. The hose tower is 10 feet wide, 10 feet deep, and 30 feet tall. The exterior sitework includes roughly; 5000 SY of 8" curb and gutter PCC pavement, 2100 SY of 6" curb and gutter PCC pavement, 7800 CY of modified subbase, 1500 LF of subdrain, 1000 LF of 12"-24" RCP Storm Sewer, 18 storm sewer intakes and structures, service pipe and connections, grading, plantings, traffic control, testing and other miscellaneous associated work.