Ankeny-Aircraft Hangar Phase 2

Bid Date: 1PM on 09/26/2025

Project Location

Scheduled Start Date

11/25/2025

Demolition, site work, paving, renovation and addition to a mixed-use development in Ankeny, Iowa. Completed plans call for the addition of a military facility; for the demolition of a military facility; for the renovation of a military facility; for site work for a military facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; and water / sewer project. An addition of a 6,400 SF single story aircraft hangar operated by the IAARNG to an existing 8,000 SF aircraft hangar operated by the Iowa Department of Public Safety. The addition includes hangar space for a single aircraft, office, support and maintenance spaces. The addition will be a pre-engineered metal building frame with metal panel cladding. The sitework consists of underground utility work in and around the site, concrete sidewalk, and parking and roadway paving, The MEPT infrastructure systems will be served by domestic water, sanitary, storm, power, and telecom utilities. Mechanical and Plumbing systems include HVAC units and distribution ductwork, plumbing fixtures, underground plumbing systems, and radiant heaters in the hangar space. Electrical and technology systems include electrical service power and distribution, lighting, and data and audio-visual systems.