Johnston CSD Timber Ridge Elem Vestibule Add & Site Renovation

Bid Date: 3PM on 11/20/2025

Project Location

Scheduled Start Date

6/1/2026

Scheduled Completion Date

9/18/2026

Site work, paving and renovation of a mixed-use development in Johnston, Iowa. Completed plans call for the renovation of a educational facility; for site work for a educational facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water sewer project. The Timber Ridge Elementary School, Site Renovation Project consisting of removing existing dry-laid retaining wall and designated existing concrete paving and sidewalks and constructing new vestibule and loading dock structure addition, new loading area concrete paving, new concrete sidewalks and drainage flume, new storm sewer drain piping and manhole structures and new site grading and sod.